CLIENT: City of Woodinville

PROJECT OWNER: City of Woodinville

START DATE: 04/2018

END DATE: 10/2019

ROLE: Prime Contractor

MAJOR WORK ELEMENTS: 

  • Retrofit of an existing Prestressed Girder bridge over Sammamish River to add Pedestrian sidewalk
  • Construction of a new Prestressed Girder single span bridge over Sammamish River completed within one foot of existing adjacent bridge on one side and active railroad track on the other. 
  • Challenging Traffic Control constraints maintained throughout construction
  • 240 LF of 4 FT. Diameter Bridge Shafts 
  • Installation of 690 LF of WF58G Prestressed Concrete Girders over the Sammamish River and an active Bike/Pedestrian Trail
  • Installation of two new Rail Road Crossings
  • Placement of 150 CY of Concrete Class 4000 for Bridge

Project Photos

Project type
Structures